Project of delivery of forty-two automotive engineering units by railroad transport

In early February 2014 Novorossiysk Port Terminal Ltd. completed the project for delivery of forty-two automotive engineering units by railroad transport. This project was carried out in the course of the finishing works of building company client in Novorossiysk and relocation of the whole volume of equipment used at the facility to the permanent seat of the company. Over a period of 6 months the following works were accomplished, such as:
- transfer of equipment to railway terminal
- short storage while awaiting for stock inflow, stowage and securing on railway platforms in accordance with pre-designed sketches, diagrams and drawings
- further delivery for the carrier RZhD OJSC [Russian Railways]

Seven oversized equipment units, including one long unit, were shipped by one lot. The total equipment volume has been sent by means of 33 railway trucks, including specialized platforms for wheel vehicles.
In early February 2014 Novorossiysk Port Terminal Ltd. completed the project for delivery of forty-two automotive engineering units by railroad transport.
Trucks fitted with low-bed trailers were used for equipment delivery from the place of temporary dislocation to the terminal of loading.
Loading of equipment on railway platforms was implemented under its own power via ramp; crane with loading capacity of 25 tons was used for loading of separate parts of vehicles.
Carriage and lashing of equipment on platforms was provided according to pre-defined sketches, diagrams, schemes unprovided by specified criterion [NTU schemes], drawings of carriage and fixing of oversized cargo.
After completing the fixing procedures there were implied measures for preventing the looting of equipment for a period of rail delivery preparation, such as: - dismantling easily removable parts - protecting of breakable parts - security sealing - handing over to departmental security service of Railway Transport of the Russian Federation.
Seven oversized equipment units were shipped by 1 lot.
Besides, one of oversized units was also over-length. The shipment of this unit was carried out by means of protecting distance platform.





View all projects

Welcome to Maritime Days in Odessa!